• Contact
  • About
  • ISSN 3049-9798
  • Authors and editors
NEWSLETTER SIGN UP
Bylines Scotland
Advertisement
  • Home
  • News
  • Politics
  • Society
  • Health
  • Environment
  • Science and tech
  • Podcast
No Result
View All Result
  • Home
  • News
  • Politics
  • Society
  • Health
  • Environment
  • Science and tech
  • Podcast
Bylines Scotland
Home News

HMS Prince of Wales arrives in Scotland for repairs

The Royal Navy's newest aircraft carrier has arrived in Rosyth for repairs.

George Allison by George Allison
11-10-2022 07:00
in News
Reading Time: 4 mins read
A A
HMS Prince of Wales approaches Forth Bridge. Picture (c) Dave Cullen Photography, printed with permission.

HMS Prince of Wales approaches Forth Bridge. Picture (c) Dave Cullen Photography, printed with permission.

Share on Bluesky

The Royal Navy’s newest aircraft carrier, HMS Prince of Wales, has arrived in Rosyth to be drydocked for repairs. As first reported by the UK Defence Journal, the vessel broke down off the Isle of Wight in August after it set sail for the United States. Since it was unable to continue the mission sister-ship HMS Queen Elizabeth deployed instead.

According to the Royal Navy in a statement, inspections by divers revealed the shaft coupling had failed and the “fastest and safest way” to fix the massive warship was to return the vessel to the drydock in which it was assembled at the Babcock yard in Rosyth.

“The aircraft carrier is heading for Rosyth for work on her starboard (right-hand) propeller shaft which suffered a mechanical defect as the ship left for New York last month. Inspections by divers revealed the shaft coupling had failed. The fastest and safest way to repair it and return the ship to operations will mean the carrier will enter dry dock in Rosyth, one of the few yards capable of accommodating the 65,000-tonne warship.”

Timescale for repairs still unknown

The Royal Navy stated that since the aircraft carrier returned to Portsmouth Naval Base in early September, the ship’s engineers had been working with divers and expert naval architects and engineers from Babcock – who run the dockyard at Rosyth – and the MoD’s Defence Equipment and Support organisation to work out what is needed to return HMS Prince of Wales back to operations.

“The extent of and the timescale for the repairs will not be fully known until the ship is in dry dock and has been thoroughly inspected by engineers, but the goal is to return HMS Prince of Wales to front-line operations as quickly and safely as possible. In the meantime the mighty 33-ton starboard propeller was removed ahead of her journey to the Firth of Forth.”

Image via author, printed with permission.
News

Fresh ferry delay “disappointing” say builders

by George Allison
29 September 2022

Top brass remains optimistic

The Royal Navy were also keen to point out in their statement that the ship had sailed from Portsmouth with a full complement of crew – 750 men and women – who will remain with the ship and continue training for renewed operations as well as supporting the maintenance package while in Rosyth.

“While alongside in Rosyth, they will continue to crew and train on the ships systems for their operational roles while also taking advantage of their temporary new home’s stunning Scottish landscape to undertake leadership and adventurous training activities during the autumn and winter months.”

Prior to departing Plymouth for Scotland, ship’s Captain, Richard Hewitt, was quoted as saying:

“While our plans to push the boundaries of the UK’s carrier innovation are temporarily on hold, I am immensely proud of the ship’s company who have risen to the challenge of preparing for repairs while facing the short-term disappointment of a postponed deployment. Now that the initial engineering challenges have been overcome to allow us to sail, we will transit to Rosyth where we will continue to work hard with our industry partners in the dockyard to ensure the shaft is repaired as quickly as possible and return HMS Prince of Wales to the front line to continue her operations.”

While under repair, her autumn programme, which included operating with F-35B Lightnings, MV-22 Osprey tiltrotors, and drones off the Eastern Seaboard of the USA is being rescheduled for 2023.

Thank you to Dave Cullen Photography for allowing us the use of the fantastic image of the aircraft carrier entering Rosyth.

Tags: DefenceDefence and securityRosyth

Sign up for the Bylines Scotland newsletter

* indicates required

Consent for having Bylines Network store my submitted information

You can unsubscribe at any time by clicking the link in the footer of our emails. For information about our privacy practices, please visit our website.

We use Mailchimp as our marketing platform. By clicking below to subscribe, you acknowledge that your information will be transferred to Mailchimp for processing. Learn more about Mailchimp's privacy practices.

George Allison

George Allison

George Allison has a degree in cyber security from Glasgow Caledonian University. He has a keen interest in naval and cyber security matters and has appeared on radio and television to discuss current events. He has been covering defence and cyber security for around ten years and has written for numerous publications around the world with a focus on issues ranging from Scottish shipbuilding to the South China Sea.

Related Posts

My Scotland

The restoration of ‘Killie’ civic pride

by Kenneth Crane
6 October 2026
Economics

Why we should insist on a Scottish currency from Independence Day

by David Murray
27 September 2026
Education

Students from Gaza risk losing life-changing university places

by Jennie Kermode
23 September 2026
Scotland

Not a Union, but the project of a union

by David Murray
2 September 2026
President Donald Trump participates in a press conference with departing DOGE adviser Elon Musk, Friday, May 30, 2025, in the Oval Office. (Official White House Photo by Molly Riley)
Economics

Undue Influence: The politics and practicality of taxing the super-rich

by Geoff Thompson
31 August 2026
Next Post
Crimean Bridge that links Russia with Crimea over the Kerch Strait. Photography courtesy of John Bryson, printed with permission

The Crimean Bridge and Putin’s dysfunctional decision-making

PLEASE SUPPORT OUR CROWDFUNDER

BROWSE BY TAGS

Afghanistan Charity Christmas Climate Change Council areas Covid19 culture Defence Defence and security Democracy Devolution Election environment European Movement Fish Farms Glasgow History Holyrood Journalism Labour literature Monarchy Monetary policy NHS NHS Scotland Out and about politics Press release Pulse of the NHS Reviews Rights and freedoms Russia Scientific research Scotland Scottish economics ScottishIndependence ShipBuilding SNP society Sport and recreation Tories UK economics Ukraine Universal Basic Income Westminster

MY SCOTLAND

A pretty path stretching from a stunner of a town to a beauty of a village

5 October 2026

LETTERS

Person typing an email

Letters to the editor

22 December 2023
Bylines Scotland

We are a not-for-profit citizen journalism publication. Our aim is to publish well-written, fact-based articles and opinion pieces on subjects that are of interest to people in Scotland and beyond.

Bylines Scotland is a trading brand of Bylines Networks Limited which is separate to, but allied with, Byline Times.

Learn more about us

No Result
View All Result
  • About
  • Authors and editors
  • Complaints
  • Contact
  • Donate
  • Letters
  • Privacy
  • Network Map
  • Network RSS Feeds
  • Submission Guidelines
  • Download the Bylines Network App

© 2022-2026 Bylines Scotland. Powerful Citizen Journalism. ISSN 3049-9798

No Result
View All Result
  • News
    • Economics
    • Education
    • Scotland
  • Politics
    • Brexit
    • Europe
    • Holyrood
      • Election 2026
    • United Kingdom
    • World
  • Society
    • Arts and entertainment
    • Culture
    • History
  • Health
  • Environment
  • Science and tech
  • Authors and editors
  • Podcast

Newsletter sign up

CROWDFUNDER

© 2022-2026 Bylines Scotland. Powerful Citizen Journalism. ISSN 3049-9798

-
00:00
00:00

Queue

Update Required Flash plugin
-
00:00
00:00